Equipment selection
Sized from the load and the ductwork you actually have, not copied off the old data plate. We tell you where a like-for-like swap is the right answer and where it is not.
Everything on the roof, in the ceiling, behind the kitchen and inside the cold room — serviced, repaired and replaced by one contractor who documents the work.
Most Valley commercial buildings are conditioned by packaged rooftop units, and most of them are worked far harder than the design ever assumed. Summer ambient in the 100s, agricultural dust on every coil, and a curb that has been resealed by three different trades.
Refrigeration failure has a clock on it. Product starts degrading long before anyone notices a number on a wall display, which is why a drifting box is an emergency even when nothing has actually stopped.
Doors that are hard to pull open, a kitchen that smokes back into the dining room, a restroom that never clears: that is almost always a pressure problem, not a fan problem. Exhaust without matched make-up air pulls conditioned air out of the space and money out of the meter.
We find buildings running full cooling overnight, sensors reading the wrong zone, and thermostats locked out by a code nobody has any more. Fixing the control is often cheaper than anything mechanical and shows up on the next bill.
A rooftop changeout is a crane, a permit, a power isolation, a curb adapter and a closing shift — and a building that has to be open the next morning.
Sized from the load and the ductwork you actually have, not copied off the old data plate. We tell you where a like-for-like swap is the right answer and where it is not.
Permit pulled, Title 24 documentation prepared, inspection scheduled, and the closed permit handed over with the job file.
Crane or boom lift booked, roof protection down, street or lot access arranged, and the swap staged so the site loses as little trading time as possible.
Where a site has ten ageing units, replacing them in a planned sequence over a season beats replacing them one emergency at a time.
New ductwork, diffusers, zoning and equipment relocation when a space is being fitted out or reconfigured for a new tenant.
Economizer repair, control strategy, high-efficiency replacement and the paperwork for available utility rebate programmes on qualifying equipment.
The failure modes, the access, and the cost of downtime are different in every one of these. So is the way we schedule the work.
Dust-loaded condensers, long refrigeration runs, and a season that does not tolerate downtime. Pre-season condition surveys are worth more here than anywhere else.
Hood exhaust and make-up air, walk-ins, prep refrigeration and a dining room that has to hold temperature through a 105°F afternoon. Work scheduled between services.
Display cases, back-of-house coolers, entry-door pressure and multiple rooftop units on different schedules. Repairs staged so the floor stays open.
Zone comfort complaints, ventilation rates, filtration, and quiet work in occupied space — including early-morning and after-hours access.
High-bay heat, exhaust and evaporative ventilation, office and QA rooms inside the shell, and equipment that is awkward to reach without a lift.
Work planned into holidays and weekends, documentation for facilities records, and package units that have to survive another year until budget arrives.
Call, and tell us what the equipment is doing rather than what you think is wrong — the noise, the temperature, whether the fan is turning, what the display says. It usually tells us what to put on the truck.
We give you an arrival window on the phone. If we cannot get there fast enough to be useful, we say so on that call instead of letting you wait.
Send the site details and we will come back within one business hour.